Summary: Rete Ferroviaria Ionica is looking for construction companies to work in partnership with Ionian construction companies to build the Taranto - Ornsvot high-speed railway

The approval of the high-speed railway project will finally complete the coastal high-speed railway. The project will be divided into 3 sections and each section will have an Ionian construction company as a partner to complete the section. The total cost of the project is Auro 6,234,123,567, which is allocated as follows

rR9qBgj.jpg

Because of the three sections, the cost per section was calculated by doing a division by 3 of the total cost, so each section will have a total cost of 2,078,041,189 Auro. The total cost of the section will be divided into two in order to pay the construction companies and thus the construction company will receive 1,039,020,594 Auros from RFI.

The payment will be made in 6 installments starting from the beginning of construction until the completion and opening of the operation of the work. The cost of each installment is 173,170,099 Auros. 

Because of the three sections, the cost per section was calculated by doing a division by 3 of the total cost, so each section will have a total cost of 2,078,041,189 Auro. The total cost of the section will be divided into two in order to pay the construction companies and thus the construction company will receive 1,039,020,594 Auros from RFI.

The payment will be made in 6 installments starting from the beginning of construction until the completion and opening of the operation of the work. The cost of each installment is 173,170,099 Auros.

Technical specifications of the high-speed railway

Total length: 857Km

Gauge: 4 ft 8 1⁄2 in (1,435 mm) 

Track spacing: 5m

Minimum curvature: 5500m

Maximum slope: 21% per thousand

Type of rotary: UIC 60

400-kg prestressed concrete sleepers 

Elastic type attachments

Hydraulic type movable heart diverter

Electrical system: 2 x 25 kV - 60 Hz

Command and signaling system: ITCS (ERTMS - ETCS Level 2) Level 2 with GSM-R

Section 1: Taranto-Torre dell'Orso

wOoDubA.png

Ionian Construction Company Partner: PHONEIX CONSTRUCTION

Track length: 285 Km

The route is developed in a prevelantly flat area with the presence of hills. The construction of the Chiatona high-speed station is planned in the route. Below are some rendering images of the station.

Spoiler

aixtgvfromair.jpg

23135575300_49f164722b_b.jpg

1596808967-img-servicesaix-blog.jpg?auto

The project includes the construction of interchanges between the historic line and the high-speed line.  The project also includes the renovation and modernization of the Torre dell'Orso station. Here are some pictures of the new part of the railway station dedicated to high-speed trains

Spoiler

the-main-hall-looking.jpg?w=1200&h=1200&

Torino-Porta-Susa-credit-Michele-d-Ottav

Torino_stazione_porta_susa.jpg

Section 2: Torre dell'Orso - Hettuborg

QSH3rky.png

 

Ionian Construction Company Partner: LEO CONSTRUCTION

Track length: 285 Km

The route is on a flat stretch and is crossed by the Adria and Volturno rivers indicating the construction of railway bridges. This sectioni involves upgrading the Tropea station 

Spoiler

Lisbon_Oriente_Station_(42264380264).jpg

estacao-do-oriente.jpg

The project includes the construction of a bridge across the Andria River 

Spoiler

Piacenza_-_ponte_ferroviario_AV_-_vista_

The project includes the construction of a bridge across the Volturno River 

Spoiler

TOSCANA1.jpg

The construction of the Adria high-speed train station is planned

Spoiler

Stazione_Mediopadana_alta_velocit%C3%A0_

06_07_2020_Mediopadana_AV.jpg

Hettuborg station will also undergo an upgrade to accommodate high-speed trains

Spoiler

la-nuova-stazione-zaha-hadid-napoli-afra

f3f1acff7f33c385bf17f2baef867fbc.jpg

Section 3: Hettuborg - Ornsvot

 

ll2avtw.png

Ionian Construction Company Partner: FAVIGLIA CONSTRUCTION

Track length: 285 Km

The route is developed on the plain, so no complex works are planned except for the stations. The project involves the construction of a new railway station in Galdurmar. Below are renderings of the new Galdurmar train station.

Spoiler

13-12-26-Gare_de_Li%C3%A8ge-Guillemins_b

Li%C3%A8ge_Luik_L%C3%BCttich_(4411635751

The construction of the tortori high-speed rail station is planned

Spoiler

Avignon_TGV_train_station_sky_view.jpg

Avignon_Station_(TGV)_2011.jpg

To conclude, Ornsvot station undergoes modernization to accommodate high-speed trains.

 

Requirements to participate 

 

Interested construction companies must submit formal documentation showing their recent infrastructure projects, a report on site safety, environmental management at their construction sites as well as the working condition of their personnel.  Interested companies must submit their applications no later than 29 February

PROCEDURE

All companies interested in participating in this auction must submit the documents here:

Ing. Riccardo Passera (Minister of Transport)

Department of Transport  

Via Nomentana 34 - San Foca , Ionio

Email: ricpa@transport.government.in

 

Edited by Ionio (see edit history)
Link to comment
×
×
  • Create New...