Jump to content

Project Adlantis-South: Private Tender


Recommended Posts

PROTECTED- GALEO

SENSITIVE

 

REQUEST FOR PRIVATE TENDER - PROJECT ADLANTIS-SOUTH 1

 

 

ATM ID: [||||||||||||||||||||||||||||||||||||||||||||||||]

AGENCY: MINISTRY OF DEFENCE, Office of Military Industry & Infrastructure, Adlantic Projects Group

CATEGORY: [|||||||||||||||||||||||] - Maritime Infrastructure Construction

CLOSE DATE: 04 MAY, 2021 | STATUS: OPEN

PUBLISH DATE: 12 JANUARY, 2021

LOCATION: HMGS TANGIMOANA, Whareroa

ATM TYPE: REQUEST FOR PRIVATE TENDER

 

DESCRIPTION

Following a co-signed agreement with @Gallambrian Ministry of Defence [||||||||||||||||||||||||||||||||||||||||||||||||], the Adlantic Projects Group of the Office of Military Industry & Infrastructure is inviting maritime engineering and/or maritime construction contractors approved and verified by the Gallambrian Ministry of Defence to undertake an expansion of HMGS Tangimoana under the TRIDENT Joint Bases Agreement. 

As surveys are complete, we attach preview limited-disclosure draft prints of the infrastructure to be built. 

 

PROJECT REQUIREMENTS:

  • 2x Dry Docks with dimensions and strength to accomodate a load of these specifications:
    • Dry Tonnage: 90,000 tonnes
    • Length: 360 metres
    • Width: 86 metres
    • Depth: 12 metres
  • Container Yard
    • Area: 8,000 square metres
    • Concrete, Fenced
  • Personnel Compound
    • Capacity: 1,500 PAX
    • Amenities include: living quarters, offices, workshops, galley/mess facilities, recreational facilities, underground alotment for command and control, shelters.

 


 

REQUEST FOR PRIVATE TENDER - PROJECT ADLANTIS-SOUTH 2

 

 

ATM ID: [||||||||||||||||||||||||||||||||||||||||||||||||]

AGENCY: MINISTRY OF DEFENCE, Office of Military Industry & Infrastructure, Adlantic Projects Group

CATEGORY: [|||||||||||||||||||||||] - Maritime Infrastructure Construction

CLOSE DATE: 04 MAY, 2021 | STATUS: OPEN

PUBLISH DATE: 12 JANUARY, 2021

LOCATION: [||||||||||||||||||||||||||||||||||||||||||||||]

ATM TYPE: REQUEST FOR PRIVATE TENDER

 

DESCRIPTION

The Adlantic Projects Group of the Office of Military Industry & Infrastructure invities maritime engineering and/or maritime construction contractors approved and verified by the Gallambrian Ministry of Defence to consider an opportunity to construct pre-fabricated maritime infrastructure. The project requires up to 200 small concrete caisson components rated for exposure on the high-seas.

We attach preview limited-disclosure draft prints of the infrastructure to be built. 

 

 

PROJECT REQUIREMENTS

  • 200x Caisson components with dimensions and strength to accomodate a load of these specifications:
    • Exterior Dimensions: 40x40x40 metre hollow concrete construction
    • Interior Volume: 54872 square metres
    • Note that each component must be linkable to the other upon reach the site with limited support.
  • Logistical Support
    • Transport of the Caissons to the site.
  • Construction Support
    • Labour in assembling and anchoring the Caissons.

ukO0mOV.png
FACTBOOK | NEWS | FOREIGN AFFAIRS | TWITTER | ARCHIVES |

FOUNDER AND MEMBER OF:

ATARA-TRADE | TRIDENT -DEFENCE WARD-AIR DEFENCE |

Link to post
Share on other sites
  • Similar Content

    • By Asgeirria
      SB18+1+21+8+8+56, VRAIM TOG=1 MIN PUB=-1
      Aeson: Our friends in the Coalition report vulnerability; the populous is... repressed. Their military is in disrepair, their men have not seen combat.
      Brandt: Our navy is ready for movement. Supplies for an invasion and troops have been massed at the jump off point.
      Elizabeth: What of this Technocracy movement among our youth? Are we ignoring the subversive measures being taken by the Sunset Sea Isles and Synturia? 
      Markus: Their agenda will allow greater penetration of our agents into foreign nations. We should harden our ECI, and encourage the movement.
      Elizabeth: I concur... the preparations will be made. Shall we distract corporate industry with defensive construction on the coasts?
      Lance: I will handle it. We'll have the new HQ set up very soon, though it's taken quite some time to do it without public knowledge. We've had to dispose of some hikers.
      Marius: Time passes too slowly. The Hyena II is nearly ready for production, as well as the MBT-1.
      Atash: Will our invasion draw attention from the international community?
      Aeson: Our agents have heard rumblings of expansion elsewhere, though I will need to get more details. Agents will be reassigned.
      SB18+1+21+8+32+26 VRAIM TOG=1 MIN PUB=-1
×
×
  • Create New...